A fast track fit-out of a 47,000m2 omni-channel distribution facility operated by Clipper Logistics on behalf of SuperGroup Distribution Centre in Burton on Trent whose brands include the iconic Superdry and Cult. The project incorporated a multi level mezzanine, pallet racked areas and bulk stock/marshalling areas.
PWP provided a full design and build suite of fit-out services including energy efficient lighting and heating solutions, air sampling and point detection fire alarm system, conveyor, workbench and battery charge power and local service requirements. The main offices were also enhanced with locker/toilet facilities, canteen, cellular offices and communications room. All office areas were fitted with VRV comfort cooling and upgraded ventilation.